Channel 7 Studios
Docklands
 
 
Location
Docklands (Cnr Latrobe Street and Docklands Highway)
Client
Channel 7
Architect
Buchan Group
Construction Cost
$35 million

 

 

 

   Designed specifically for Channel 7 to meet its needs for digital broadcasting.

Channel 7 Studios

The complex comprises six levels of reinforced and post-tensioned concrete, with three large studios and other broadcast facilities. It also accommodates all outside broadcast vehicles.

Bonacci Group provided full civil and structural consulting engineering services, including design of acoustic slabs for the specialist sub-contractor.

 

Previous | Return to Commercial | Next