Projects
|
|
Civil Projects
|
Mt Stromlo Water Treatment Plant
The project involved civil and building design for UV building and water tanks, sludge thickener, dewatering building, various minor structures, road works and retaining walls.
Click for Project Information Sheet |
|
| Rouse Hill Rwp
Stage 2 Amplification, IDAL Tanks and Equalisation Basin
A large sewage tank was constructed in Western Sydney. The project was won
using a unique method for constructing the retaining walls that involved post
tensioning the walls to reduce cracking and using the good quality sandstone
foundation which enabled the builder to save significant costs, due to the
complexity of the model a full Strand7 finite element model of both the tank
and the foundation was undertaken.
Project involves construction of four number IDAL tanks, 24 x 48 metres x 5.85
metres high and an equalisation basin 27 x 49 metres, with a wall height
ranging from 4.40 to 6.9 metres. The walls of the tanks have been designed to
be socketted into the underlying rock and act as cantilevers. The project was
secured on a ‘design-construct’ basis.
Click for Project Information Sheet |
|
|
|
Leisurelink Aquatic Centre
The Leisurelink project incorporates a first stage relocation and subsequent
construction of a Geelong Baseball Centre playing field. The second stage of the
Leisurelink project is the construction of the Aquatic Centre on the corner of Colac
Road (Princes Highway) and Pioneer Road in Waurn Ponds. The facility incorporates an
Olympic grade pool, outdoor leisure water activities, and indoor fitness facilities.
This project encompasses Water Sensitive Urban Design initiatives and integrated
water cycle management approaches. These include capture, treatment and reuse of
stormwater runoff, pool backwash water and other water applications.
Click for Project Information Sheet |
|
| Royal Melbourne Hospital
An extensive programme of civil engineering works has been carried out at the Royal Melbourne Hospital, including:
• an audit of existing stormwater systems, analysis of the existing system capacity and preparation of a stormwater management plan
• provision of new underground stormwater and sub-soil drainage to serve new buildings
• design of new pavements and alterations to existing pavements
• surface grading of exterior pavements and landscaping to direct stormwater to the underground system
Click for Project Information Sheet |
|
|
|
West Webb Dock
Stages 1 and 2 Car Terminal
This $7.0 million first stage development for Strang Stevedoring Australia Pty Ltd, comprises 7.0 hectares of regraded pavement, with access roads to the
wharf structures. The wharf structures comprise berthing dolphins, mooring dolphins and mid-ship and stern access bridges for loading and unloading. The
wharf is designed to berth vessels up to 30,000 tonnes and 200 metres in length. Bonacci Group was responsible for the structural, civil, electrical and
hydraulic engineering for this project. The second stage involved reclamation of land fill of Stage 1, to create new car park storage for cars.
Click for Project Information Sheet |
|
| Ford - You Yangs Testing Facility
Vehicle Dynamics Area (VDA)
The VDA project incorporates 2.3km of asphalted road surface and a 3.3 hectare asphalted dynamics test surface which were designed and constructed to extremely tight tolerances.
Bonacci Group utilised the three dimensional visualisation capacity of 12D to produce a simulated drive through to allow the client to more clearly picture the shape of the test area project.
Click for Project Information Sheet |
|
|
|
Waverley Gardens Shopping Centre
A two stage $80 million redevelopment, including new Coles supermarket, with multi-level carparking and truck access across the front of the complex, along with
additional retail followed by construction of a 6 metre high cantilever retaining wall, new Big W outlet, all with carparking above and a truck ‘ring’ road. The food court
was revamped and new mall extension was created to connect north-west carpark.
Bonacci Group undertook all civil and structural aspects, including detailing of old to new connections.
Click for Project Information Sheet |
|
| Werribee Plaza
Bonacci Group has provided civil and structural services to suit the two most recent major upgrades, including food court, specialty shops, along with Big W and Safeway
and Harris Scarfe, followed by a new Kmart and mall upgrade, with minor food court and the linking of old and new centres with a new mall.
Bonacci Group also designed external pavements and roads, a major sewer diversion and carried out stormwater drainage analysis and design.
Click for Project Information Sheet |
|
|
|
|
|