|
Steel Park, Dandenong, Victoria
A steel distribution and fabrication complex, which, in Stage 1, consists of a 12,000
square metre steel coil and bar storage building and 2-storey office building of 2,000
square metres, combined with associated site infrastructure.
A complex flood study was required to ensure that surface flows and flood storage
were properly integrated into this low lying and flood prone a area.
Click for Project Information Sheet
|