Master of Civil Engineering (by thesis) Queensland University of Technology, Brisbane.
Bachelor of Civil Engineering with first class honours, Queensland University of Technology, Brisbane.
Past Chairman, Queensland Division Structural Branch, Institution of Engineers, Australia
| Civil Infrastructure |
| Wetalla Water Reclamation project |
$34 million |
 |
| Maroochy STP Alliance |
$32 million |
 |
| Merrimac Water Future Alliance |
$55 million. Structural design leader with furher development and refinement post-tensioned monolithic tank design techniques. |
 |
| Brisbane Water Enviro Alliance |
$180 million. Structural design leader across four plants being Oxley, Sandgate, Wacol and Wynnum. Introduced and developed large pour post-tensioned monolithic construction techniques for tank design. |
 |
| Central Emergency Power Supply bunk for RAAF Base Townsville |
Buried bunker style facility modelled using FEA techniques. |
 |
| Sandgate WWTP |
Stage 1 inlet works. |
 |
| Bulimba Creek Trunk Sewer |
Deep Maintenance Hole design for 1500 DN sewer.
Develop standard details of 18m deep maintenance holes for Brisbane Water. |
 |
| Lime dosing Tanks (steel) |
Nightcap WTP |
 |
| South East Transit Project (SET4) |
Numerous soil retaining structures.
Various value engineering assignments including Kessels Road Bridge extension, Meckiff Street Wall, Mimosa bridge. |
 |
| Douglas Water Treatment Plant Upgrade |
Townsville. |
 |
| Luggage Point Water Reclamation Project |
Effluent takeoff channels and wells. |
 |
| Gunalder Range Crossing |
Retaining wall design and slope stability analyses |
 |
| Maryborough Cogeneration Power Station |
Including a 56m high stack (tender design). |
 |
| South East Queensland Busway Network |
5 No. Transit Stations. |
 |
| Carol Park Brisbane |
60m high boiler stack (tender design). |
 |
| Bond University |
Telecommunication Tower. |
 |
| Kangaroo Point Boardwalk |
Stage 2, Brisbane. |
 |
| Marine and Mining |
| Design review of LNG wharf facility |
Darwin. |
 |
| Design review of East Arm Common User wharf |
Stage 2. |
 |
| Hamilton Mineral Separation plant |
Surge Bin, 1000t silo, 800t silo. |
 |
| Glebe Island Sea Wall |
Sydney. |
 |
| Portside Wharf Development |
Brisbane (tender alternative). |
 |
| Otomona bridge |
100 clear span , West Papua. |
 |
| P.T. Freeport Gold and Copper |
Coal storage cover foundation design, Indonesia. |
 |
| Western Mining Company |
Fertiliser receival, storage and reclaim facility, Townsville. |
 |
| East Arm Port Development |
Common User wharf Stages 1&2 and Bulk liquid berth (tender). |
 |
| Quezon Power Station |
Marine facility, Philippines. |
 |
| Marine facility for Ross Island Development |
Department Of Defence, Townsville. |
 |
| Shute Harbour Redevelopment |
(tender design). |
 |
| Ely Bauxite Project, Weipa |
3200m long jetty. |
 |
| Lihir Project |
Barge loading wharves 1 and 2, PNG. |
 |
| Manila Grains Terminal |
(tender design). |
 |
| Lihir Project |
Barge maintenance Wharf, PNG. |
 |
| Lihir Project |
Sea dump facility, Lihir Barge Loading Wharf. |
 |
| PNG Napa Napa Oil Refinery |
Marine facility (tender design). |
 |
| Dredeco wharf facility |
Brisbane. |
 |
| Southern Cross Cement Jetty |
Philippines (tender design). |
 |
| Burnie No.7 Berth rear deck |
Tasmania. |
 |
| West Port, Port Klang |
Malaysia (tender design). |
 |
| Mount Isa Mines |
Blast furnace modification. |
 |
| Lihir Gold Project, PNG |
General Cargo Wharf (tender design). |
 |
| HMAS Waterhen |
Waverton, NSW (tender design). |
 |
| Permanent and Temporary Sheet Pile Works |
| Glebe Island development |
Basement excavation. |
 |
| Temporary cofferdam |
Bribie Island. |
 |
| Ok Tedi |
River wharf facility, PNG. |
 |
| Melbourne City Link Project |
Proof engineering of cellular cofferdams. |
 |
| Haughton Pump Station, Queensland |
Temporary cofferdam. |
 |
| Forensic Engineering |
| Luggage Point WWTP |
Gas storage bell derailment. |
 |
| South East Transit Project |
Analysis and report into the concrete cracking of the tunnel roof. |
 |
| Wastewater Treatment Plants |
Numerous reports into the concrete cracking and leakage |
 |
| Report on a collapsed wharf in Indonesia |
|